Diversion of Nullah at 1.2MW HPS Raikote.(15th July, 2024 to 15 Sept,2024)
Const. of Retaining wall.( Protective Bund near suspension Bridge at 1.2MW HPs sheikh Tangir
Rehabilitation work of damged portion of waste way and removal of accumulated deposits from damaged public land at 2mw hps ph-ii thack.(sub head: under pining works of damaged waste way bed i/c protective work
Diversion Of Head Work Of 1.6MW HpS at Thore Damaged Due To Flood Damaged
Supply and Fixing of wooden Sign Boards I/C all Accessories/ Fixing of Tiles in bath rooms of CED Chilas
Removal of flood deposits from power channel & Re- Const of R/Wall at 1.2MW HPs Tangir
Repair of Penstock pipe i/c welding cutting at 3.6MW HPS at Thore & hiring of Excavator Machine and repair of control gate