| 1 |
Metalling of road from RCC Bridge Umalsat to Darkut |
Technical Evaluation |
XEN B&R Division Ghizer |
10-11-2025 |
20-11-2025 |
|
|
| 2 |
Metaling of Road from Chatorkhand to Bilhanze |
Technical Evaluation |
XEN B&R Division Ghizer |
10-11-2025 |
20-11-2025 |
|
|
| 3 |
Construction of 10 Bedded Hospital into 30 Bedded Hospital at Chatorkhand Ghizer |
Technical Evaluation |
XEN B&R Division Ghizer |
10-11-2025 |
20-11-2025 |
|
|
| 4 |
Repair & Maintenance of Vehicels |
Technical Evaluation |
Deputy Director GB GS BF & GI, Gilgit |
13-11-2025 |
20-11-2025 |
|
|
| 5 |
CONSULTANCY SERVICES OF ARR PROJECT IN GILGIT-BALTISTAN |
Technical Evaluation |
Chief Conservator Forest Parks & Wildlife GB |
14-11-2025 |
21-11-2025 |
|
|
| 6 |
Construction of Water Irrigation Channel Pipe Khani Saltoro Ghanche |
Technical Evaluation |
Deputy Director Water Management, Ghanche |
24-11-2025 |
02-12-2025 |
|
|
| 7 |
GREATER WATER SUPPLY SCHEME JUGLOTE SUB DIVISION BUNNERDASS & MINIMARG. (SUB HEAD: HIRING OF ENGINEER SERVICE FOR DETAIL SURVEY ESTIMATION DRAWING DESIGN AND PREPARATION OF PC-IS FOR DEVELOPMENT PROJECTS OF 2021-22 WORK SECTOR) |
Technical Evaluation |
XEN PHE Division, Gilgit |
24-11-2025 |
30-11-2025 |
|
|
| 8 |
Construction of Boys PS at Cheruch Gini Chilas |
Technical Evaluation |
Executive Engineer Works(Education) Diamer-Astore Division |
28-11-2025 |
05-12-2025 |
|
|
| 9 |
Construction of Girls PS at Babusar Bachi |
Technical Evaluation |
Executive Engineer Works(Education) Diamer-Astore Division |
28-11-2025 |
05-12-2025 |
|
|
| 10 |
Construction of Girls PS at Dara Moh.Thilkuch Khanbary |
Technical Evaluation |
Executive Engineer Works(Education) Diamer-Astore Division |
28-11-2025 |
05-12-2025 |
|
|